Paragon Engineering
Millenium Hotel, RamallahAll electrical, network and security infrastructure for the Mozaic Restaurant and M-Cafe, with dimming lighting and a KNX control system integrated with mechanical equipment.
KNX integrationElectrical works, low-voltage systems, datacenters, solar, fire and security, and maintenance for clients across every sector we serve.
Showing 21 of 21 selected projects
All electrical, network and security infrastructure for the Mozaic Restaurant and M-Cafe, with dimming lighting and a KNX control system integrated with mechanical equipment.
KNX integration10 kVA UPS devices with all distribution boards and wiring to feed every network rack throughout the building.
10 kVA UPSFiber cabling installation and migration of fiber and copper cabling from old switches to new switches at the main datacenter.
Datacenter migrationCisco router installation with all DC power cabling and protection, and migration of fiber and copper cabling to the new routers.
Cisco router migrationA datacenter room for 4 racks with power and network infrastructure, a dedicated distribution panel, fiber, AC units, raised floor and wall insulation.
4-rack datacenter roomA datacenter room for 4 racks with cable trays, a dedicated distribution panel, fiber optics, AC units, raised floor and wall insulation.
4-rack datacenter roomNew industrial UPS sources for all datacenter racks, load transferred live, plus smart-metered APC PDUs, STS and panel maintenance with thermal imaging.
Zero-shutdown load transferA datacenter room for 8 racks with all power and network infrastructure, cable trays, a dedicated distribution panel, and relocation of existing racks.
8 racks in 3 daysWork and logistics for the university’s solar project: MDBs, MV step-up transformer, switchgear, RMUs and all medium and low voltage cabling with sensing, control and monitoring.
1.2 MW solar projectFiber optics ODF and data communication units for the Jericho industrial zone solar project, including splicing and testing.
Industrial zone solar data linkRooftop photovoltaic system on the factory with all DC, AC and inverter installation.
117 kW rooftop PVRooftop photovoltaic system on the factory with all DC, AC and inverter installation, plus the 1 MW MDB and Skytron SCADA components.
550 kW rooftop PVA fire fighting system with fire cabinets, pumps, piping and water reserve tanks.
Fire fighting systemThermal imaging inspection of the electrical panels at every branch, delivered with a fully detailed report.
Every branch panel inspectedLaboratory biosafety systems with smart access control for the Ministry’s Covid laboratory and other facilities.
Smart access controlSEDCO queueing systems for three branches, with all hardware, software licensing and programming.
3 branch queueing systemsSurveillance in multiple locations of the city, with all IP cameras transmitted over wireless trunks to the municipality monitoring room.
City-wide CCTVComputer network, access control, FM200, fire alarm and burglar alarm infrastructure for the foundation’s office in Amaar Tower.
FM200 and alarmsAll types of maintenance for power, lighting, low voltage, computer network and server room systems.
Ongoing since 2016All types of maintenance for power, lighting, low voltage, computer network and server room systems.
Ongoing since 2015Full datacenter fit-out: cable trays, security and firefighting, AC sequence control, distribution panel, environmental monitoring, rack relocation and new backbone network rewiring.
Complete datacenter fit-out